Save Template Dialog Box
Use this dialog box to save a graph report that you created from the Analyze form. The report is saved in XML format.
To use a specific template for the CV vs SV (Cost Variance vs Schedule Variance) graph report, enter the location and filename for the new template in the CV-SV chart template file field in the Analyze section of the Preferences tab of the Project Properties dialog box.
To use a specific template for the S, P, A, ETC Curves graph report, enter the location and filename for the new template in the Curve chart template file field in the Analyze section of the Preferences tab of the Project Properties dialog box.
- Related Topics:
- Location
Parent Topic: Analyze Form
How to...